Project Information
Phase I: Drilling and Testing
The drilling and testing phase will require a drilling rig with a 40-foot tall mast, equipment trucks, mud pumping-equipment, diesel generator, forklift and other smaller equipment. The photos below illustrate a typical drilling operation.
The contractor will start by delivering equipment and constructing 24-foot sound-wall panels around the perimeter of the project to assist with noise and light abatement to residents - some noise and light will still be experienced. Drilling commences once the sound-wall is established and will occur on a 24-hour basis in order to prevent a collapse in the well. This phase can last up to 16 weeks.