Overview

Scottsdale’s Transportation & Streets Department manages a variety of street and infrastructure improvement projects in-house. These projects are smaller in scope and budget and typically require less than 90 days to construct. Examples of these projects include:

These projects are smaller in scope and budget and typically require less than 90 days to complete.

  • Adding and extending right-turn lanes at intersections
  • Constructing pedestrian refuge islands
  • Installing Pedestrian Hybrid Beacon crosswalks
  • Modifying and installing traffic signals to improve roadway safety and efficiency

If we are working on a project near your home or business, you should have received project notification. Residents and business owners adjacent to the work area are encouraged to visit this website for project details and updates.

Project Work Hours

Work is typically scheduled on weekdays only between the hours of 5 a.m. and 5 p.m. Weekend work will be scheduled if needed.

Traffic Restrictions

Most in-house projects do not require road closures; however, traffic may be restricted near work zones. Please use caution when traveling near work zones, follow detour signs and plan ahead to avoid delays.

Portion Indian Bend Wash Multiuse Path Near Osborn Road Closed for Improvements

Improvements to a section of multiuse pathway adjacent to the Continental Golf Club are underway. Construction will take place between the 3rd St. and Earll Drive alignments and path entrances; work is scheduled Monday – Friday from 6 a.m. to 6 p.m. The path will be closed approximately two months during construction.

The work includes replacing the existing path surface with new concrete, widening the path from 8 to 10 feet, and applying fresh striping in the area. The bike and pedestrian bridge over Osborn Road is not included in this project; however, the bridge will be closed during construction to allow crews access to the bridge entrances.

Cyclists and pedestrians should follow detour signs along the path directing traffic onto Miller Road using 78th and 2nd streets and Pinchot Drive. We appreciate your cooperation during construction as we work to improve the city’s more than 125 miles of multiuse path amenities.

Traffic Calming Improvements at 78th St. and Gold Dust Ave.

Learn about recommended traffic calming near 78th St. and Gold Dust Ave. at a public meeting on May 1

The community is invited to learn more about the recommended traffic calming solutions
on 78th St. near Gold Dust Ave. and enhanced pedestrian safety in the area.

Join us for a presentation followed by a Q&A session.

Thursday, May 1, 2025
Via Linda Senior Center, Room 123
10440 E. Via Linda
Scottsdale, AZ 85258
5:30 to 7 p.m.

Last Updated: Apr 25, 2025

Loading...
Was this page helpful?
Tell us how we can be more helpful.

This form is used to collect information about our web content and determine future improvements. If you would like to submit a request for service or receive a response, please submit a ScottsdaleEZ work order.

Transportation

7447 E. Indian School Road Suite 205 Scottsdale, AZ 85251
Back to Top