Investing in Our Scottsdale

Image of Capital Improvement Plan
Capital Improvement Plan

Detailed information on each of the city’s capital projects including: project description, cost, geographic location, funding sources, and operating impacts.

Image of Scottsdale Arterial Life Cycle Program Projects
Scottsdale Arterial Life Cycle Program Projects

he projects shown on the map are included in the Maricopa Association of Governments (MAG) Arterial Life Cycle Program (ALCP)

Image of Bond 2019 Projects
Bond 2019 Projects

A list of projects that were approved as part of the 2019 Bond Election.

Construction Project List

Reset Filters

Project Phase

Funding Source

Sponsoring Division

Project Zip Code

  1. 68th Street Bike Lanes

    Completed

    Transportation

    This project will make a series of improvements to 68th Street between Indian School Road and Thomas Road with the goal of improving safety, connectivity, and the quality of life...

  2. 68th Street Sidewalk - Arizona Canal to Camelback Road

    Design

    Transportation

    The city will construct a 6-foot sidewalk on both sides of 68th Street from the Arizona Canal to just south of Camelback Road. The project will provide a consistent paved...

  3. Aquifer Storage and Recovery Wells

    Construction

    Water

    Beginning in the fall of 2020, Scottsdale is constructing four new aquifer storage and recovery wells at strategic locations throughout the city.

  4. Ashler Hills Park

    Construction

    Community Services

    This project will build a 17-Acre neighborhood park at Ashler Hills Drive and 74th Way.

  5. Bike and Pedestrian Studies

    Planning

    Transportation

    The City of Scottsdale wants to hear from you as part of two studies to improve bike and pedestrian connections.

  6. Bond Project 25: Replacing Aging Buildings that Comprises Paiute Community Center, The Residence at Paiute

    Planning

    Community Services

    The City of Scottsdale is in the early planning stages for two different projects at Paiute Neighborhood Center. The center opened in 1995 to fulfill a need for community programs...

  7. Build Multiuse Sports Fields in the area of Bell Road

    Construction

    Parks & Recreation

    This project will build up to 13 full-sized multi-use sports fields along the Bell Road Corridor to meet the increased demand for lighted sports fields in the community, create the...

  8. Camelback Sidewalk

    Construction

    Transportation

    A new sidewalk was constructed on the north side of Camelback Road between Miller Road and 73rd St. The project will provide a consistent paved sidewalk to improve pedestrian movement...

  9. Carefree Highway

    Design

    Transportation

    The city of Scottsdale is in the early stages of design for improvements to Carefree Highway, from Cave Creek Road to Scottsdale (Tom Darlington) Road, to improve the capacity and...

  10. Civic Center Improvements

    Construction

    Planning & Development

    The construction fence has come down around the final portion of Scottsdale’s Civic Center renovation opening access to the Children’s Gardens, Water and Fog Plaza, new restrooms, City Hall Lagoons...

  11. Civic Center Mall Master Plan

    Completed

    Community Services

    On May 1, 2018, the Scottsdale City Council approved a Master Plan for the Civic Center area which lays the groundwork for major and minor repairs to infrastructure, the addition...

  12. DC Ranch Neighborhood Park

    Planning

    Parks & Recreation

    DC Ranch Neighborhood Park will be built in two phases. Phase one is currently underway and is scheduled to be complete during the spring of 2022. Planning for phase two...

  13. Fire Station 606 Renovation

    Design

    Fire

    The City of Scottsdale is making several improvements to Fire Station 606 which is located at the northeast corner of Via Linda and 108th St.

  14. Fire Station 612

    Construction

    Fire

    Design and construct a new 12,000 square foot fire station northwest of the Airpark near the 101 and Hayden Road to improve response times.

  15. Granite Reef Watershed Drainage and Flood Control Improvement

    Construction

    Stormwater & Floodplain Mgmt

    The primary objective of the Granite Reef Watershed Improvement Project is to eliminate the risk of structural flooding, eliminate the Federal Emergency Management Agency (FEMA) floodplain along Granite Reef Wash,...

  16. Happy Valley Road: Pima Road to Alma School Road

    Construction

    Transportation

    This project will widen Happy Valley Road to two through lanes in each direction with a landscaped median, curb and gutter, bike lanes, sidewalk and drainage improvements from Pima Road...

  17. Indian Bend Wash - Repair Lakes and Irrigation

    Construction

    Community Services

    Work began in mid-January to repair the irrigation system in a section of Eldorado Park between Murry Lane and McDowell Road. Eldorado Pond is closed while the irrigation system around...

  18. Indian Bend Wash Master Plan: Thomas to McKellips

    Completed

    Community Services

    The City of Scottsdale’s Indian Bend Wash is an oasis of parks, lakes, paths and golf courses traversing 11 miles through the heart of Scottsdale. The greenbelt features more than...

  19. Indian Bend Wash Underpass at Chaparral Road

    Construction

    Transportation

    This project will create a new pedestrian underpass along the Indian Bend Multi-use Path on the east side of Hayden Road under Chaparral Road. The project will increase safety at...

  20. Install High Efficiency Sports Lighting at 4 Facilities

    Completed

    Community Services

    This project replaced, upgraded or installed new lighting systems for sports fields at Laguna and Pima schools, Horizon Park and at two unlit fields at Scottsdale Sports Complex to meet...

  21. Miller Road - Pinnacle Peak Road to Happy Valley Road

    Construction

    Transportation

    This project will connect Miller Road between Pinnacle Peak Road and Happy Valley Road, including a bridge over the Rawhide Wash. Completing this connection will create a new option for...

  22. Pima Road Improvements: Pinnacle Peak Road to Happy Valley Road

    Completed

    Transportation

    Construction is complete on improvements to Pima Road between Pinnacle Peak Road and Happy Valley Road. Improvements to Happy Valley Road are still underway and will be complete in the...

  23. Raintree Drive Extension

    Construction

    Transportation

    The Raintree Drive Extension will provide a direct connection between the State Route Loop  101 Freeway and Scottsdale Road. This extension will simplify the route from Hayden Road to Scottsdale...

  24. Reata Wash Flood Control Study

    Design

    Stormwater & Floodplain Mgmt

    The Reata Wash floodplain encompasses a large area in north Scottsdale between approximately Pinnacle Peak Road and the Central Arizona Project Canal. Approximately 30 years ago, the Federal Emergency Management...

  25. Replace Tennis Court Surface at Indian School Park and Scottsdale Ranch Park

    Completed

    Parks & Recreation

    This project will replace thirty-six, old asphalt tennis courts at Indian School Park and Scottsdale Ranch Tennis Center with post-tension concrete -- a modern system that will dramatically increase the...

  26. Scottsdale Road Improvements Jomax Road to Dixileta Drive

    Construction

    Transportation

    Construction will begin in November 2024 on a two-mile segment of Scottsdale Road from Jomax Road to Dixileta Drive. Construction is scheduled to take approximately 18 months to complete.

  27. Scottsdale Water Campus New Laboratory Building

    Design

    Water

    Scottsdale Water Campus is building a new 19,000 sf, single story Water Quality Laboratory Building adjacent to the existing Administration Building.

  28. Shea Boulevard ITS & Intersection Improvements

    Construction

    Transportation

    Work is underway to install Intelligent Transportation System (ITS) fiber, vaults and conduit along Shea Blvd. between Loop 101 and 136th Street. The ITS installation will improve traffic operations along...

  29. Thomas A. Hontz Police & Fire Training Facility Renovation

    Construction

    Public Safety

    First responders in Scottsdale will have new facilities to train at thanks to three bond projects that will replace, modernize and expand the fire and police training buildings at the...

  30. Thomas Road: 56th Street to 73rd Street

    Design

    Transportation

    This project will make several needed improvements to Thomas Road between 56th Street and 73rd Street. The project will address the maintenance needs of the roadway and replace and/or upgrade...

  31. Thompson Peak Park Dog Park

    Design

    Parks & Recreation

    This project will build a three-and-a-half-acre dog park consisting of separate fenced and gated areas. The park will be designed and constructed in a manner similar to the off-leash area...