Project Phases & Tentative Schedule
Area 1: Turf Areas Conversion
Murray Lane to McDowell Road
COMPLETE
Several landscaping areas around the Boys and Girls Club received new irrigation systems and in many places turf areas were converted to low water use landscaping.
Area 2: Irrigation Pipeline Replacement
Murray Lane to McDowell Road
COMPLETE
Eldorado Park (west side of low flow channel)
- Eldorado Park Pond cleaned of sediment build-up
- Irrigation system replaced (main line and all laterals/emitters) in turf areas of park
Area 3: Irrigation Pump Station Replacement
Murry Lane to McDowell Road
CONSTRUCTION SPRING 2025
This phase of construction will replace the pump station to use water stored in the pond for irrigation of park fields.
- Sanitary sewer line and manholes to be installed in entry drive/parking area by Eldorado Pool.
- Drain Eldorado Park Pond and relocate aquatic life to Chaparral Lake
- Excavation for Pump Station and bore for new intake pipe
- Construct new irrigation pump station (walls, pumps, controllers, equipment)
- Fenced areas to remain fenced until Bermuda grass is reestablished
Area 4: Lakes, Channel and Irrigation System Improvements
Vista Del Camino Park, McDowell Road to Roosevelt Street
CONSTRUCTION SCHEDULED TO BEGIN IN FALL OF 2025
This phase of the project will make several changes to Vista del Camino Park.
Work will include:
- Installation of new lake liner in north and south lakes, new concrete edge, lakes to be deeper for water quality
- Removal of the middle lake
- Construction of a new low flow channel between N-S lakes
- Installation of new irrigation system, with smart two-wire controller
- Build new irrigation pump station (CMU walls, pumps, controller, equipment)
- Realignment of the multi-use paths (MUP)
Area 5: McKellips Lake Park
Roosevelt Street to McKellips Road
CONSTRUCTION TEANITIVILEY SCHEDULED FOR FALL 2027
This phase of the project is currently under final design and is anticipated to begin in the Fall of 2027.
Work will include:
- The installation of a new lake liner and new concrete edge on south lake
- Removal of the north lake by the ball fields
- Removal of the dam and construction of a new low flow channel
- Installation of new irrigation system, with smart two-wire controller
- The construction of a new irrigation pump station in the existing maintenance yard.
- Conversion of the water source from well water to SRP water (from the lake)
- Realignment of the multi-use paths (MUP)
Please note that the dog park will remain in its current location.
Area 6: East Eldorado Park Low-flow Channel and Irrigation Systems
Murry Lane to McDowell Road
CONSTRUCTION TEANTIVLEY SCHEDULED FOR FALL 2026
This phase of the project is currently under final design and is anticipated to begin in the Fall of 2026.
Work will include:
- The construction of a new low flow channel with concrete access steps, meandering between existing Mesquite trees. Gabions adjacent to trees for watering.
- Installation of new irrigation system
- Realignment of the multi-use paths (MUP)